July 17, 2025

Ribbon Mixer for Biomass – The Key to Consistent Pellet Production

(Also Known As: Biomass Mixer, Spiral Biomass Blender, Pellet Buffer Mixer) 📘 Description At PelletIndia, with over 25 years of hands-on experience in biomass project design and machinery manufacturing, we emphasize the critical importance of a Ribbon Mixer in any biomass pellet plant. Designed specifically for fibrous and lightweight biomass materials, the Ribbon Mixer ensures […]

Continue reading

बायोमास के लिए रिबन मिक्सर – निरंतर पेललेट उत्पादन की कुंजी

(अन्य नाम: बायोमास मिक्सर, सर्पिल बायोमास ब्लेंडर, पेललेट बफ़र मिक्सर) 📘 विवरण PelletIndia, जो कि 25 वर्षों से अधिक का बायोमास प्रोजेक्ट डिज़ाइन और मशीनरी निर्माण का अनुभव रखता है, यह दृढ़ता से मानता है कि रिबन मिक्सर किसी भी बायोमास पेललेट प्लांट का अभिन्न हिस्सा है। यह विशेष रूप से बायोमास जैसे हल्के और […]

Continue reading
July 16, 2025

🔹 Nabha Power (NPL) Tender Overview: Supply of Agro-Residue Based Non-Torrefied Biomass Pellets

📌 Tender By: Nabha Power Limited (NPL)📍 Location: Rajpura, Punjab, India🗂 Tender Document No.: NPL/Biomass Pellets/2024-25/089📅 Tender Issue Date: 15th July 2025🌐 Website: NPL Tender Page📥 PDF Download: Download Tender Document 📘 Description NPL invites bids for a one-year contract for the supply of agro-residue-based non-torrefied biomass pellets. The contract aims to support the blending […]

Continue reading

Top Indian States Offering Highest Subsidies for Biomass Pellet Plant Setup (2025)

📘 Description: India’s push towards sustainable energy has created fertile ground for biomass pellet plant investments. Certain states stand out by offering high capital subsidies, tax exemptions, and institutional support. This guide details the most supportive states—Punjab, Haryana, Maharashtra, and Madhya Pradesh—including costs, net profit estimates, and key policy advantages. 📊 Detailed Summary by State […]

Continue reading
July 9, 2025

📢 MNRE Revised Guidelines – Biomass Pellet Subsidy Scheme 2025 Update

📄 Description The Ministry of New and Renewable Energy (MNRE) has issued revised guidelines dated 27th June 2025 under the Biomass Programme of the National Bioenergy Programme (2021–2026 Phase-I). These changes simplify documentation, enhance clarity on eligibility, update performance benchmarks, and strengthen monitoring mechanisms for briquette and pellet manufacturing plants. Notably, this update aligns with […]

Continue reading